Teapot Dome Service Station
The Teapot Dome Service Station in Washington state, USA, is a former gas station regarded as a classic example of mimetic architecture.
Built in the shape of a teapot, it was one of many such novelty buildings found along highways as ‘attractions’ during the 1920s and 30s. However, this building is more significant than most as it was an architectural reminder of a government scandal.
The Teapot Dome Scandal of 1921-22 involved bribery and corruption in avoiding competitive bidding on petroleum reserves. It had a damaging impact on the then-President Warren Harding, and the Interior Secretary Albert Fall was sent to prison. Some of the reserves were located at Teapot Dome, Wyoming.
The building was hand-crafted and built in 1922 on what would become known as Route 12. Measuring 14 ft in diameter, it comprises a circular frame clad in timber shingles, with a conical roof, sheet metal in the shape of a teapot handle, and a concrete stove pipe that was constructed to resemble a spout.
The service station remained operational until 1978 when Interstate 82 was built nearby. It was then badly damaged by a car and reconstructed 1.2 miles away. In 2012, it was moved to its current location at 117 First Avenue, Zillah, Washington, and completely restored. Having been listed on the US National Register of Historic Places, it now serves as a visitor centre and tourist attraction.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.